Post Construction Checklist

  • All Rooms | Common Areas

    Remove fine construction dust from ceilings, vents, fans, and light fixtures

    Clean walls, baseboards, trim, doors, and switches

    Vacuum all surfaces — floors, vents, upholstery, and corners

    Wipe interior windows, sills, tracks, and frames

    Remove paint, caulk, or sticker residue from glass and hardware

    Polish fixtures and mirrors to restore shine

    Final vacuum and mop for a move-in-ready finish

  • Bathrooms

    Remove construction film and residue from tiles, glass, and fixtures

    Sanitize sinks, toilets, tubs, and showers

    Clean and polish mirrors and chrome

    Wipe inside and outside of cabinets and drawers

    Scrub grout and tile lines to remove dust buildup

    Mop and disinfect floors

  • Bedrooms

    Dust and wipe closets, shelves, and rods inside and out

    Clean windows, tracks, and sills

    Remove debris and construction dust from walls and flooring

    Vacuum carpets or mop hard floors

    Polish mirrors and wipe furniture if installed

  • Kitchen

    Wipe inside and outside of all cabinets and drawers

    Clean appliance interiors and exteriors (oven, fridge, dishwasher, microwave)

    Remove construction residue from counters, backsplash, and sink

    Sanitize faucets and handles

    Polish stainless steel and glass surfaces

    Vacuum and mop to eliminate dust and debris